17th & 18th October 2001
Further exascerbated by:
•A system of liability operating in a « competitive vacuum » at the design stage which tends towards over-design by architects and engineers; and
•A system of cost planning in Great Britain developed by the quantity surveying profession which tends to set budgets which in the first instance are too high (much easier than too low!)
No wonder that Latham and Egan have asked for a 30% cost reduction.
But how will they get it ?